Ontario Launches First G7 Mini Nuclear Reactor in $21 Billion Project

Ontario Launches First G7 Mini Nuclear Reactor in $21 Billion Project
Above: People pass the Ontario Power Generation Office Building in Toronto, Ontario on March 8, 2025. Image credit: Zou Zheng/Contributor/Xinhua News Agency via Getty Images

The Facts

  • Ontario Power Generation received approval to begin construction on Canada's first small modular reactor (SMR) at the Darlington nuclear site, with the initial 300-megawatt unit expected to power 300,000 homes when completed by 2030.
  • The project encompasses four SMRs with a total cost of $20.9 billion, with the first reactor estimated at $7.7 billion — including $1.6 billion in shared infrastructure costs across all units.
  • The initiative promises economic benefits, creating 18,000 construction jobs and maintaining 3,700 permanent positions annually over 65 years, with 80% of project spending directed to Ontario-based companies, potentially generating $38.5 billion in gross domestic product (GDP).

Sources Split


The Spin


Narrative A

The SMR project represents a crucial step forward in securing Ontario's energy independence and economic future. The technology offers a reliable, clean power solution that can be deployed faster and more efficiently than traditional nuclear plants, while creating thousands of high-skilled jobs and establishing Ontario as a global leader in nuclear innovation.

Narrative B

This project's reliance on a U.S.-based firm, GE Hitachi technology, poses significant risks during ongoing trade tensions, particularly the dependence on enriched uranium fuel from American sources. The massive investment could be better directed toward renewable energy alternatives that don't create long-term nuclear waste management challenges or foreign technology dependencies.


Metaculus Prediction

© 2026 Improve the News Foundation. All rights reserved.Version 7.17.1

© 2026 Improve the News Foundation.

All rights reserved.

Version 7.17.1